Assessment of Cost Influences in Rail Projects from Contractor's Perspectives
DOI:
https://doi.org/10.11113/ijbes.v11.n1.1204Keywords:
Construction Project Management, Construction Cost Management, Rail Projects, Structural Equation Modelling.Abstract
Rail transportation had been receiving more attention in the Government’s effort to enhance the Malaysian economy internationally. Nevertheless, rail projects involve various stakeholders, massive budgets and are susceptible to cost overrun. This paper aims to evaluate the cost influences concerned with rail projects in a developing nation from contractors’ perspectives. The existing studies lack the consideration of the correlation and relationship between the cost influences, which this paper emphasizes. The data collection was performed by distributing questionnaires to 200 cost managers which are quantity surveyors, project managers, and contract executives across the rail projects in Malaysia. The data analysis uses Statistical Package for Social Sciences Version 27 (SPSS V27) and Structural Equation Modelling (SEM). Kaiser-Meyer-Olkin (KMO) measure of sampling adequacy showed appropriate internal consistency of the research instrument, whereas the Confirmatory Factor Analysis (CFA) showed acceptable Goodness-of-Fit Indices (GFI) within the constructs of the structural model. The SEM calibration resulted in 23 significant cost influences which were clustered into five groups of cost influences. Each of the five groups is associated with different parties in construction projects. A notable causative direction was observed in the relationship between the cost influences. Each cost influence can be connected to each project phase based on the PMBOK Guide. This study adds to the various cost management research along the project management of rail construction. It is able to contribute to the policymakers and consultants in strategizing their cost management plans which is crucial, especially in developing countries such as Malaysia. Emphasizing the critical particulars of cost management in rail projects, this paper also delivers its finding based on stakeholder and system aspects in relation to cost management, which can be referred to by any developing country.
References
Andrić, J. M., Wang, J., & Zhong, R. (2019). Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of Belt and Road Projects. Sustainability (Switzerland), 11(5). https://doi.org/10.3390/su11051302
Cantarelli, C. C., Flyvbjerg, B., & Buhl, S. L. (2012). Geographical Variation in Project Cost Performance: The Netherlands Versus Worldwide. Journal of Transport Geography, 24: 324–331. https://doi.org/10.1016/j.jtrangeo.2012.03.014
Chen, S., Sutan, R., & Hisham, J. (2018). Trip characteristics as the determinants of intention to shift to rail transport among private motor vehicle users in Kuala Lumpur , Malaysia. Sustainable Cities and Society, 36(November 2017): 319 326. https://doi.org/10.1016/j.scs.2017.10.030
Cho, E., & Kim, S. (2015). Cronbach’s Coefficient Alpha: Well Known but Poorly Understood. Organizational Research Methods, 18(2): 207–230. https://doi.org/10.1177/1094428114555994
Cui, C., Han, X., Zhou, Q., Xu, M., Xia, B., Skitmore, M., & Liu, Y. (2022). Impact of passengers’ perceptions of social responsibility activities on the efficacy of PPP urban rail transit projects. Cities, 130(August), 103987. https://doi.org/10.1016/j.cities.2022.103987
Fariq, N., & Ab Rani, N. I. (2020). Cost Risk Impact for Railway Construction Project. International Graduate Conference on Engineering, Science and Humanities (IGCESH) 2020, August, 5–9.
Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., Glenting, C., Holm, M. S., Lovallo, D., Lunn, D., Molin, E., Rønnest, A., Stewart, A., & van Wee, B. (2018). Five Things You Should Know About Cost Overrun. Transportation Research Part A: Policy and Practice, 118(July): 174–190. https://doi.org/10.1016/j.tra.2018.07.013
Flyvbjerg, B., Holm, M. K. S., & Holm, M. K. S. (2004). What Causes Cost Overrun in Transport Infrastructure Projects ? 24(1): 3–18. https://doi.org/10.1080/0144164032000080494a
Hair, J. F., Babin, B. J., & Krey, N. (2017). Covariance-Based Structural Equation Modeling in the Journal of Advertising: Review and Recommendations. Rohrer College of Business Faculty Scholarship.
Hermida, R. (2015). The problem of allowing correlated errors in structural equation modeling: concerns and considerations. Computational Methods in Social Sciences, 3(1): 5–17.
Hildreth, L. (2013). Residual Analysis for Structural Equation Modeling. In Graduate Theses and Dissertations. Iowa State University Capstones, Theses and Dissertations. https://lib.dr.iastate.edu/etd/13400
Hwang, B. G., Shan, M., Zhu, L., & Lim, W. C. (2020). Cost control in megaprojects: efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5): 437–449. https://doi.org/10.1080/15623599.2018.1484976
Invernizzi, D. C., Locatelli, G., & Brookes, N. J. (2017). Cost overruns - Helping to define what they really mean. Proceedings of the Institution of Civil Engineers: Civil Engineering, 171(2): 85–90. https://doi.org/10.1680/jcien.17.00001
Ismail, M. Z., Ramly, Z. M., & Hamid, R. A. (2021). Systematic review of cost overrun research in the developed and developing countries. International Journal of Sustainable Construction Engineering and Technology, 12(1): 196–211. https://doi.org/10.30880/ijscet.2021.12.01.020
Jaafar, A. R. (2018). Malaysia’s Road Infrasture Development. The Daily Engineering & Construction News, 3.
Kline, R. B. (2016). Principles and Practice ofStructural Equation Modeling (4th Edition). The Guilford Press.
Lee Yuk, P. (2009, November 6). RM6bil Ipoh-Rawang track plan has cost overrun reaching RM1.14bil. The Star. https://www.thestar.com.my/news/nation/2009/11/06/rm6bil-ipohrawang-track-plan-has-cost-overrun-reaching-rm114bil
Liu, S., Yao, E., & Yamamoto, T. (2018). Does Urban Rail Transit Discourage People from Owning and Using Cars? Evidence from Beijing, China. Journal of Advanced Transportation, 2018. https://doi.org/10.1155/2018/1835241
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice, 92: 184–194. https://doi.org/10.1016/j.tra.2016.08.007
Love, P. E. D., Zhou, J., Edwards, D. J., Irani, Z., & Sing, C. P. (2017). Off The Rails: The Cost Performance of Infrastructure Rail Projects. Transportation Research Part A: Policy and Practice, 99: 14–29. https://doi.org/10.1016/j.tra.2017.02.008
Massey, A., & Miller, S. J. (2016). Tests of Hypotheses Using Statistics. Mathematics Department, Brown University, Providence, RI 2912, 1–32.
Mesbah, M., Sahraei, M., Soltanpour, A., & Habibian, M. (2022). Perceived service quality based on passenger and trip characteristics: A structural equation modeling approach. Journal of Rail Transport Planning and Management, 23(August 2021): 100340. https://doi.org/10.1016/j.jrtpm.2022.100340
Ministry of Economic Affairs. (2018). Mid-term Review of the Eleventh Malaysia Plan 2016-2020.
Narayanan, S., Kure, A. M., & Palaniappan, S. (2019). Study on Time and Cost Overruns in Mega Infrastructure Projects in India. Journal of The Institution of Engineers (India): Series A, 100(1): 139–145. https://doi.org/10.1007/s40030-018-0328-1
Niu, Y., Li, H., Ye, K., Mahmoudi, A., & Deng, X. (2022). Determinants of Coopetition Relationships in International Joint Ventures for High-Speed Rail Projects. KSCE Journal of Civil Engineering, 26(5): 2036–2057. https://doi.org/10.1007/s12205-022-1649-1
Olawale, Y. A., & Sun, M. (2010). Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice. International Journal of Project Management, 28(5): 509–526. https://doi.org/10.1080/01446191003674519
Olawale, Y., & Sun, M. (2015). Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management, 33(3): 623–637. https://doi.org/10.1016/j.ijproman.2014.10.003
Park, Y. I., & Papadopoulou, T. C. (2012). Causes of Cost Overruns in Transport Infrastructure Projects in Asia: Their Significance and Relationship with Project Size. Built Environment Project and Asset Management, 2(2): 195–216. https://doi.org/10.1108/20441241211280873
PMBOK Guide. (2021). A Guide to the Project Management Body of Knowledge (the PMBOK Guide) (6th ed.). Project Management Institute.
Rahman, N. A. A., & Abdullah, Y. A. (2016). Theorizing the Concept of Urban Public Transportation Institutional Framework in Malaysia. MATEC Web of Conferences, 66: 1–6. https://doi.org/10.1051/matecconf/20166600043
Sadullah, M., Ghazali, M., & Rashid, A. (2018). Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6): 234–242. https://doi.org/10.1680/jmapl.16.00034
Shaaban, K., & Hassan, H. M. (2014). Modeling significant factors affecting Commuters’ perspectives and propensity to use the new proposed metro service in Doha. Canadian Journal of Civil Engineering, 41(12): 1054–1064. https://doi.org/10.1139/cjce-2013-0595
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8): 1471–1480. https://doi.org/10.1016/j.ijproman.2014.04.004
Tabachnick, B., Fidell, L., & Ullman, J. (2019). Using multivariate statistics. MA: Pearson.
Tee Lin, S. (2012). PDP to bear MRT cost overruns of over 15%. The Star. https://www.thestar.com.my/business/business-news/2012/02/09/pdp-to-bear-mrt-cost-overruns-of-over-15
The Sun Daily. (2015). AG’s Report 2015: ERL Extension from KLIA to KLIA2 incurred a RM29m budget overrun. https://www.thesundaily.my/archive/1806581-HSARCH368070
Ullah, K., Abdullah, A. H., Nagapan, S., Suhoo, S., & Khan, M. S. (2017). Theoretical Framework of the Causes of Construction Time and Cost Overruns. IOP Conference Series: Materials Science and Engineering, 271(1). https://doi.org/10.1088/1757-899X/271/1/012032
Vaske, J. J., Beaman, J., & Sponarski, C. C. (2017). Rethinking Internal Consistency in Cronbach’s Alpha. Leisure Sciences, 39(2): 163–173. https://doi.org/10.1080/01490400.2015.1127189
Yan, H. ., H. E, L., C., G., F., Z., & W., T. (2019). Critical success criteria for programs in China: Construction companies’ per- spectives. Journal of Management Engineering, 35 (1): 04. https://doi.org/10.1061 /(ASCE)ME.1943-5479.0000659.
Downloads
Published
How to Cite
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Copyright of articles that appear in International Journal of Built Environment and Sustainability belongs exclusively to Penerbit Universiti Teknologi Malaysia (Penerbit UTM Press). This copyright covers the rights to reproduce the article, including reprints, electronic reproductions or any other reproductions of similar nature.
Authors who publish with this journal agree to the following terms:
- This Journal applies Creative Commons Licenses of CC-BY-NC-SA
- Authors retain copyright and grant the journal right of publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).