Assessing E-Compliance Maturity of Public Procurement Processes in Nigeria

Authors

  • Ahmed Aminu Department of Quantity Surveying, Ahmadu Bello University, Zaria, Nigeria
  • Muhammad Yamusa Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Yahaya Makarfi Ibrahim Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Muhammad Abdullahi Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Hassan Adaviriku Ahmadu Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Bello Abdullahi Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Ahmed Doko Ibrahim Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria
  • Kabir Bala Department of Quantity Surveying; Ahmadu Bello University, Zaria, Nigeria

DOI:

https://doi.org/10.11113/ijbes.v11.n1.1205

Keywords:

Construction Project Management, Construction Cost Management, Rail Projects, Structural Equation Modelling.

Abstract

The manual approach to public procurement is plagued with inefficiencies. To address these problems, efforts were made to digitize the processes in Nigeria. However, the e-compliance readiness of procurement processes is not known. This study attempts to assess e-compliance maturity of public procurement lifecycle in Nigeria. The study adopted a mixed research approach. A qualitative research method was used to establish criteria for evaluating the readiness of public procurement processes for digitization. Focus group interview with Six (6) automation and procurement professionals was conducted to arrive at the parameters used for the readiness assessment. Consequently, a questionnaire survey was administered on experienced public procurement professionals to evaluate the e-compliance readiness of some identified public procurement processes. Best to Worst Method (BWM) was used to evaluate e-compliance maturity level. The study shows that the processes are readily compliant for digitization.

References

Abduh M, Sukardi SN, Wirahadikusumah RD, Oktaviani CZ, Bahagia SN. (2023): Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), 2171-2184 DOI: 10.1080/15623599.2022.2046941

Abdullahi B., Ibrahim Y. M., Ibrahim A. D & Bala K. (2022). Development of web-based e-Tendering system for Nigerian public procuring entities, International Journal of Construction Management, 22(2), 278-291. DOI: 10.1080/15623599.2019.1620492.

Abdullahi B., Ibrahim Y. M., Ibrahim A. D & Bala K. (2022): Development of e-Tendering evaluation system for Nigerian public sector, Journal of Engineering, Design, and Technology, 18(1): 122-149, DOI: 10.1108/JEDT-01-2019-0004

Abdullahi B., Ibrahim Y. M., Ibrahim A. D & Bala K. (2019): Developing a Web-Based Tender Evaluation System Based on Fuzzy Multi-Attributes Group Decision Making for Nigerian Public Sector Tendering, International Journal of Computer and Information Engineering, 13(7): 357-361.

Adebiyi, A. A., Ayo, C. K., & Adebiyi M. O. (2010). Development of electronic government procurement (e-GP) system for Nigeria public sector. International Journal of Electrical & Computer Sciences IJECS-IJENS, 10 (6): 74-84.

Afolabi, A. O., Oyeyipo, O. O., Ojelabi, R. A., Tunji-Olayeni, P. (2017): E-maturity of Construction Stakeholders for a Web-Based E-Procurement Platform in the Construction Industry, International Journal of Civil Engineering and Technology, 8(12): 465-482.

Afolabi, A., Ibem, E., Aduwo, E., & Olayeni, P. T. (2022): Digitizing the Grey areas in the Nigerian public procurement system using e-Procurement technologies. International Journal of Construction Management, 22(12): 2215-2224 DOI:10.1080/15623599.2020.1774836

Albano, G. L., & Dae, I., K. (2010). Public Procurement: Introduction. Journal Public Procurement. 10(3):572–605.

Aminu, A., (2021). An Evaluation of Manual-Based Procurement Processes Maturity Levels Towards Digitization [MSc. Dissertation]. ABU Zaria: Department of Quantity Surveying.

Ayangade, J.A., Wahab, A. B., & Alake, O. (2009). An investigation of the Performance of Due Process Mechanism in the Execution of Construction Projects in Nigeria. Civil Engineering Dimension. 11(1):1–7.

Batenburg R, Versendaal J. (2006). Alignment matters-improving business functions using the Procurement Alignment Framework. Workshop Inkoop Onderzoek Nederland (WION), January 2006, Lunteren, The Netherlands.

Ministry of Finance and Economic Development (2013). Belize Public Procurement Procedures Handbook. Belmopan, Belize.

Bemelmans J, Voordijk H, Vos B. (2011). Designing a tool for an effective assessment of purchasing maturity in construction. Benchmarking: An International Journal, 20(3): 342 – 361

Betts M., Black, P., Christenden, S., Dawson, E., Du, R., Duncan, W., Foo, E., & Nieto, G. J. (2006). Towards secure and legal tendering. Information Technology in Construction, 11: 89-102.Bryde, D., Broquetas, M. and Volm, J. M. (2018). The project benefits of Building Information Modelling (BIM). International Journal of Project Management. 971–980.

Cronemyr, P. and Danielsson, M. (2013), “Process management 1-2-3 – a maturity model and diagntostics tool”, Total Quality Management and Business Excellence, 24 Nos 7/8: 933-944.

Dang TP. (2011). Purchasing maturity of Rijkswaterstaat, process and organization assessment of the purchasing function [Master’s thesis]. Delft University of Technology and Rijkswaterstaat.

EDSA. (2004). State of art report volume II: case studies on European electronic public procurement project. European Union, Dynamic S. A.

EGMR (2011). E-procurement: towards transparency and efficiency in public service delivery.

European Union (2018). Public Procurement Guidance for Practitioners. London, European Union. United Kingdom.

Expert Group Meeting Report (2011). E-procurement: Towards transparency and efficiency in public service delivery. Department of Economic and Social Affairs, Division for Public Administration and Development Management, United Nation Headquarters, New York. 4-5 Oct. 2011. ST/ESA/PAD/SER.E/171.

S. Fong, S., and Yan, Z. (2009). Design of a Web-based tendering system for e-Government procurement. ACM Proceedings of the 3rd International Conference on Theory and Practice of Electronic Governance, 321-328.

Garcia de Soto, B., Agusti-Juan, I., Joss, S. and Hunhevicz, J. (2019). Implication of Construction 4.0 to the workforce and organizational structures. International Journal of Construction Management. 22(2): 205–217.

Ghanaian Public Procurement Act (2003). Published by Public Procurement Authority. Accra, Ghana.

Guth SR. (2010.) Implementing best practices: the procurement maturity model. The 95th ISM International Supply Management Conference.

Johannsen S. (2013). Updating a public procurement maturity model: the case of the MSUþmodel. F’IBA Bachelor Thesis Conference. June 27th, 2013, Enschede, The Netherlands.

Kenyan Public Procurement and Asset Disposal Act (2015). Published by Public Procurement Regulatory Authority Nairobi, Kenya.

Mahmoud, S. A. I. (2013). Public Procurement System and e-Government Implementation in Bangladesh: The Role of Public Administration. Journal of Public Administration Policy Research. 5(5): 117–123.

Mohamad R, Hamdan A, Othman ZA, Noor NMM. (2010). Decision support system (DSS) in construction tendering processes. International Journal of Computer Science. 7(2), 35-45.

Møller MM, Hedegaard J, Petersen K, Vendelbo A, Jakobsen S. 2010. Development model for public procurement–in a Danish context. Proceedings of 4th International Public Procurement Conference, Seoul, South Korea

Nigerian Public Procurement Act (2007). Published by Bureau of Public Procurement, Federal Republic of Nigeria.

Nigerian Public Procurement Manual (2008). Procurement procedures manual for public procurement in Nigeria. Published by Bureau of Public Procurement, Federal Republic of Nigeria.

NPPA. 2015. Pengukuran tingkat kematangan organisasi ULP [Assessment of procurement unit organization]. Indonesia: NPPA.

Oboirien M.O. (2006). Tendering and estimating for building students. Auchi, Edo State, Nigeria: Bestway Printers, 28–33.

OECD (2015), OECD Recommendation of the Council on Public Procurement, OECD, Paris, http://www.oecd.org/gov/public-procurement/recommendation/ (accessed on 11 September 2021).

Oesterreich, T. D. and Teuteberg, F. (2016). Understanding the implications of digitalization and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry. Computers in Industry, 83: 121-139.

Ogbu, C., Asuquo, C. F. (2018). A comparison of prevalence of unethical tendering practices at national and subnational levels in Nigeria. Africa’s Public Service Delivery and Performance Review 6(1): a217. https://doi.org/10.4102/apsdpr.v6i1.217.

Oktaviani CZ. 2018. Pengembangan model kematangan untuk penilaian kinerja sistem pengadaan pekerjaan konstruksi pemerintah [Maturity model development for performance assessment of public procurement system for construction works] [dissertation]. Institut Teknologi Bandung.

Olatunji, S. O., Olawumi, T. O. and Odeyinka, H. A. (2016). Nigeria’s Public Procurement Law- Puissant Issues and Projected Amendments. Public Policy and Administration Research, 6 (6): 73-85.

Organization for Economic Co-operation and Development (OECD). (2019). Development Co-operation Report: A fairer, Greener, Safer Tomorrow: https://doi.org/10.1787/9a58c83f-en

Plomp M, Batenburg R. (2009). Procurement maturity, alignment, and performance: a Dutch Hospital case comparison. 22nd Bled eConference, Slovenia. 203–219.

Pongsuwan P. (2016). How does procurement capability maturity affect e-procurement adoption and leverage purchasing in supply chain? International Journal of Business & Economic Development, 4(3):45–54.

Poole, D., Mackworth A.K. and Goebel, R. (1998). Computational intelligence: A logical approach. Oxford University Press.

Rachinger, M., Rauter, R., Muller, C., Vorraber, W. and Schigi, E. (2018). Digitilization and its influence on business model innovation. Journal of Manufacturing Technology Management. 30(8): 205–217.

Rendon RG. 2016. Procurement Process Maturity: Key to Performance Measurement. Journal of Public Procurement. 8(2):200–214.

Schiele, H. (2007). Supply-management maturity, cost savings and purchasing absorptive capacity: testing the procurement-performance link. Journal of Purchasing & Supply Management. 13(4): 274-293.

Sehlin, D., Truedsson, M., and Cronemyr, P. (2019). A conceptual cooperative model designed for processes, digitalization and innovation. International Journal of Quality and Service Sciences. 11(4): 504–522.

Sezer, A. A. and Brochner, J. (2019). Site Managers’ ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management. 27(1): 109–127.

Shwarka, S. M., & Anigbogu, N. A. (2012). Impact of the public procurement reform on public building projects delivery in Nigeria In: Smith, S.D (ed), Proceedings of the 28th Annual ARCOM conference, 3-5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 969-977.

Singer, M., Konstantinidis, G., Roubik, E., Beffermann, E. (2009). Does e-procurement save the state money? Journal Public Procurement. 9(1):58–78.

Song, W., Kanchana, G., Gerard, W., Siaw, W. J. (2014). How can Building Information Modelling (BIM) Support the New Rules of Measurement (NRM1) London: Royal Institution of Chartered Surveyors.

Uncitral Model Law on Public Procurement (2014). United Nations Commission on International Trade Law. United Nations, Vienna.

United Nations Public Procurement Handbook (UNPPH). (2006). United Nations Interagency Procurement Working Group (IAPWG). New York, U.S.A.

van Lith J, Voordijk H, Castano JM, Vos B. (2015). Assessing maturity development of purchasing management in construction. Benchmarking: An International Journal, 22(6): 1033 – 1057

Wernicke B., Stehn L., Sezer A. A & Thunberg M. (2021): Introduction of a digital maturity assessment frameworks for construction site operations, International Journal of Construction Management, DOI: 10.1080/15623599.2021.1943629.

World Bank (2000). Country Procurement Assessment Report: Nigeria, vol 1&2, 22246. Nigeria Country Department Africa Region.

World Bank (2012). The Middle East and North Africa (MENA) Regional Procurement Conference. Washington, DC. U.S.A.

World Bank (2018). Procurement Regulations for IPF Borrowers. Published by the World Bank. Washington, D.C., U.S.A.

Yamusa, M.A., Ibrahim, Y.M., Ibrahim, A.D., Bala, K., Abdullahi, B., Abdullahi, M., Ahmadu, H.A., et al. (2020), “A Conceptual Framework For Developing Machine Learning Models For Procurement Processes”, Proceedings of the 5th Research Conference of the NIQS (RECON 5), 273–285.

Zhang, R., Jingfei, L., Wu, S. and Meng, D. (2016). Learning to Select Supplier Portfolios for Service Supply Chain, PLoS ONE, 11(5): 1-19

Downloads

Published

2023-12-27

How to Cite

Aminu, A., Yamusa, M., Ibrahim, Y. M., Abdullahi, M., Ahmadu, H. A., Abdullahi, B., … Bala, K. (2023). Assessing E-Compliance Maturity of Public Procurement Processes in Nigeria. International Journal of Built Environment and Sustainability, 11(1), 85–101. https://doi.org/10.11113/ijbes.v11.n1.1205