A PRELIMINARY REVIEW ON TRANSACTION COST COMPONENTS WITHIN THE BIM ADOPTED PROCUREMENTS

Authors

  • Toh Ka Bean Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia.
  • Muzani Mustapa Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia.
  • Fara Diva Mustapa Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia.

DOI:

https://doi.org/10.11113/ijbes.v6.n1-2.394

Keywords:

Transaction costs, Building Information Modeling (BIM), Procurement, Construction industry

Abstract

The Malaysian construction industry although it plays a crucial function in stimulating the economy, is lagging behind other economic sectors. This is due to its unique characteristics such as fragmentation and slow technology adoption. These very characteristics make the industry susceptible to construction disputes. Construction disputes were found to incur high transaction costs (TCs), affect the parties involved, and subsequently increase overall project costs. Because TCs measure the costs that incur from transaction activities, they can be used to better understand the benefits within each transaction. Additionally, TCs are the best mechanism for analysing the ‘unseen’ costs of construction procurement. Previous studies on the traditional, design-and-build, and public private partnership (PPP) procurement methods have demonstrated TCs affect the organizational dynamics of construction and selection of procurement. The emerging Building Information Modeling (BIM) technology is said to be beneficial in addressing the problems associated with disputes and overall project costs. Consequently, many projects embark on BIM adoption in procurement. Hence, this preliminary study seeks to identify the TCs of BIM-adopted procurement by employing a structured literature review to determine the components and activities within the BIM procurement within the BIM implementation. The initial framework for the components of TCs of BIM procurement was drafted by referring to RIBA Plan of Work with BIM overlay. The components are categorised into pre-contract and post-contract components. These components can serve as the basis for developing a framework that can serve as a guideline for construction players involved in managing the TCs of BIM procurement.

References

Arcadis. (2016). Global Construction Disputes Report 2016. Contract Solutions, 17. Retrieved from https://www.arcadis.com/media/3/E/7/%7B3E7BDCDC-0434-4237-924F-739240965A90%7DGlobal Construction Disputes Report 2016.pdf

Boudreau, M.-C., Watson, R.T., Chen, A.J.W., Greiner, M. & Sclavos, P. (2007). The benefits of transaction cost economics: the beginning of a new direction. European Conference on Information Systems (ECIS). (2007): 1124–1135.

Bruin, K.De. (2015). Why Transactional Cost Analysis? GraySwan. 1–3.

Bryde, D., Broquetas, M. & Volm, J.M. (2012). The project benefits of Building Information Modelling (BIM). International Journal of Project Management. 31(2013): 971–980.

Chang, C. & Ive, G. (2000). A Comparison Of Two Ways Of Applying Transaction Costs Approach ( I ): Methodological Debates. (January). 1–17.

CRC Construction Innovation. (2007). Adopting BIM for facilities management: Solutions for managing the Sydney Opera House. CRC for construction Innovation participants.

De Schepper, S., Haezendonck, E. & Dooms, M. (2015). Understanding pre-contractual transaction costs for Public–Private Partnership infrastructure projects. International Journal of Project Management. 33(4): 932–946.

EC Harris. (2013). Supply Chain Analysis into the Construction Industry. A Report for the Construction Industrial Strategy. A Report for the Construction Industrial Strategy. (145): 1–127. Retrieved from https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/252026/bis-13-1168-supply-chain-analysis-into-the-construction-industry-report-for-the-construction-industrial-strategy.pdf

Ganah, A. & John, G.A. (2013). Suitability of BIM for enhancing value on PPP projects for the benefit of the public sector. PPP International Conference 2013 Body of Knowledge. (March): 347–356.

Gofhamodimo, C.M. (1999). Construction Contracts: Procurement Methods in Botswana.

Ho, S.P. & Tsui, C.W. (2009). The Transaction Costs of Public-Private Partnerships: Implications on PPP Governance Design. Lead 2009 Specialty Conference: Global Governmance in Project Organiations, South Lake Tahoe, CA. 5–7.

Ive, G. & Gruneberg, S. (2000). The economics of the modern construction sector. Springer.

Khalfan, M. (2015). Building Information Model and Supply Chain Integration: A Review. Journal of Economics, Business and Management. 3(9): 912-916.

Khoshnava, S.M. & Ahankoob, A. (2006). Potential Application of BIM in Construction Dispute and Conflict. Management in Construction Research Association (MiCRA). Postgraduate Conference: 178–184.

Kong, A.T. & Gray, J. (2006). Problems With Traditional Procurement in the Malaysian Construction Industry - a Survey. Proceedings Australasian Universities Building Educators Association Annual Conference. 2006: 1–21.

Kpamma, Z.E., Asare, E.K. & Ankomah, E.N. (2017). Traces of Lean Construction Practices In The Indigenous Building Culture of The Talensi of Northern Ghana. Journal of Construction Project Management and Innovation. 7(1): 1726–1738.

Li, H., Arditi, D. & Wang, Z. (2014). Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management. 21(4): 444–458.

Masterman, J.W.E. (1992). An Introduction to Building Procurement Systems. Spon.

McDermott, P. (1999). Strategic and emergent issues in construction procurement. Procurement Systems: A Guide to Best Practice in Construction: 3–26.

Mohd Nawi, M.N., Baluch, N. & Bahauddin, A.Y. (2014). Impact of Fragmentation Issue in Construction Industry: An Overview. MATEC Web of Conferences. 15: 01009.

Mosey, D., Bahram, D., Dartnell, R., Hallam, C., Howard, C., Assad Maqbool, … Winfield, M. (2016). ENABLING BIM THROUGH PROCUREMENT AND CONTRACTS A Research Report by the Centre of Construction Law and Dispute Resolution , King ’ s College London. Retrieved from https://www.kcl.ac.uk/law/research/centres/construction/enabling-bim/ebimtpac-form.aspx

Mustapa, F.D. (2014). Managing Immigrant Construction Workers In Peninsular Malaysia: The Economic Perspective.

Ofori, G. (1990). The construction industry: aspects of its economics and management. NUS Press.

Rajeh, M. (2014). Impacts of Procurement Systems on Transaction Costs: A Structural Equation Modelling Methodology. Proceedings of the 4th New Zealand Built Environment Research Symposium (NZBERS). 1829(2014): 1–34.

Rajeh, M.A., Tookey, J. & Rotimi, J. (2013). Best procurement selection: development of a conceptual model based on transaction costs. Australasian Journal of Construction Economics and Building - Conference Series. 2(2): 56.

Sinclair, D. (2012). BIM Overlay to the RIBA Outline Plan of Work. RIBA: London, (May): 1–20. https://doi.org/http://www.ribabookshops.com/uploads/b1e09aa7-c021-e684-a548-b3091db16d03.pdf

Thobakgale, M.E., Aigbavboa, C.O. & Thwala, W.D. (2014). Professional’s perception on the causes and effects of disputes in the construction industry – a theoretical exploration. 6th International Conference on Humanities, Geography and Economics. 135–137.

Thomassen, K., Vassbø, S., Solheim-Kile, E. & Lohne, J. (2016). Public-Private Partnership: Transaction Costs of Tendering. Procedia Computer Science. 100(1877): 818–825.

Williamson, O.E. (1985). The economic institutions of capitalism: Firms, markets, relational contracting. University of Illinois at Urbana-Champaign’s Academy for Entrepreneurial Leadership Historica Entrepreneurship. 61–75.

Yates, D.J. (1999). Conflict and Dispute in the Development Process: A Transaction Cost Economics Perspective. Proceedings of the 4th Pacific Rim Real Estate Society Conference, Perth, Australia. 1–14.

Downloads

Published

2019-04-01

How to Cite

Ka Bean, T., Mustapa, M., & Mustapa, F. D. (2019). A PRELIMINARY REVIEW ON TRANSACTION COST COMPONENTS WITHIN THE BIM ADOPTED PROCUREMENTS. International Journal of Built Environment and Sustainability, 6(1-2), 161–167. https://doi.org/10.11113/ijbes.v6.n1-2.394