A Preliminary Implementation Framework of Building Information Modelling (BIM) in the Algerian AEC Industry
DOI:
https://doi.org/10.11113/ijbes.v7.n3.554Keywords:
Building Information Modelling, BIM, BIM framework, BIM implementation, Algerian AEC industry.Abstract
The construction industry is one of the most growing sectors worldwide, it plays a great role in boosting the economy. The construction sector in Algeria has recently witnessed an upward growth, due to the Algerian government’s vision to develop economic activity and boost the residential construction market. On the other hand, the Algerian construction market is suffering from the lack of efficiency; projects delay and less quality of projects delivery. It becomes very necessary to find a way to improve these inefficiencies by adopting new approaches and technologies. Building Information Modelling (BIM) is becoming a widespread and common approach in the design, construction and maintenance of building facilities as BIM reduces waste, improves construction quality and enhance collaboration among the construction stakeholders. Hence, it becomes necessary to start gradually introducing BIM to the Algerian construction industry in order to improve its productivity. This paper addresses BIM implementation in the Algerian AEC industry and proposes a preliminary framework towards its implementation. Through a questionnaire survey, we explored the BIM capabilities, BIM awareness and BIM maturity of the Algerian AEC players. Based on the questionnaire findings and literature review, this paper proposes an effective BIM implementation based on both levels of macro-adoption and micro-adoption. The framework developed is based on three main aspects comprise of technology, process and policy. This study is considered as the first implementation framework of Building information modelling in the Algerian AEC industry. The framework proposed will be used as a reference for the Algerian researchers and professionals.
References
African Review. (2017). Construction at highest pace in North African countries. http://www.africanreview.com/construction-a mining/buildings/construction-at-highest-pace-in-north-african-countries. Retrieved on 19 December, 2019
Ahmed, A. L., & Kassem, M. (2018). A unified BIM adoption taxonomy: Conceptual development, empirical validation and application. Automation in Construction, 96: 103-127.
Alreshidi, E., Mourshed, M., & Rezgui, Y. (2017). Factors for effective BIM governance. Journal of Building Engineering, 10: 89-101.
Arayici, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2011). BIM adoption and implementation for architectural practices. Structural Survey.
Bimcrunch. (2016). Infrastructure Australia recommend BIM mandate for large-scale projects. https://bimcrunch.com/2016/02/infrastructure-australia-recommend-bim-mandate-for-large-scale-projects/. Retrieved on January 6, 2020
Bin Zakaria, Z., Mohamed Ali, N., Tarmizi Haron, A., Marshall-Ponting, A., & Abd Hamid, Z. (2013). Exploring the adoption of Building Information Modelling (BIM) in the Malaysian construction industry: A qualitative approach. International Journal of Research in Engineering and Technology, 2(8): 384-395.
Chen, K., & Li, H. (2015). AHP based weighting system for BIM implementation & assessment framework. Paper presented at the 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).
Chew, A., & Riley, M. (2013). What is going on with BIM. On the Way to 6D. https://www.i-law.com/ilaw/doc/view.htm?id=324633. Retrieved 20 February, 2020.
Chuan, C. L., & Penyelidikan, J. (2006). Sample size estimation using Krejcie and Morgan and Cohen statistical power analysis: A comparison. Jurnal Penyelidikan IPBL, 7: 78-86.
Dao, T.-N., & Chen, P.-H. (2020). BIM Adoption in Construction Projects Funded with State-managed Capital in Vietnam: Legal Issues and Proposed Solutions. In CIGOS 2019, Innovation for Sustainable Infrastructure, 1211-1216. Springer.
Deutsch, R. (2011). BIM and integrated design: strategies for architectural practice. John Wiley & Sons.
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2015). A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(1): 4-21.
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons.
Eastman, C. M., Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons.
Edirisinghe, R., & London, K. (2015). Comparative analysis of international and national level BIM standardization efforts and BIM adoption. Paper presented at the Proceedings of the 32nd CIB W78 Conference, Eindhoven, The Netherlands.
Hore, A. V., & Thomas, K. (2011). Advancing the use of BIM through a government funded construction industry competency centre in Ireland. CIB W78, 2011, 28th.
Kaneta, T., Furusaka, S., Tamura, A., & Deng, N. (2016). Overview of BIM Implementation in Singapore and Japan. Journal of Civil Engineering and Architecture, 10(12): 1305-1312.
Kassem, M., & Succar, B. (2017). Macro BIM adoption: Comparative market analysis. Automation in Construction, 81: 286-299.
Khalid, B., Lim, Y.-W., Ali, K. N. B., & Aljamal, A. J. A. (2019). A pilot study: Investigation of the current practices and the feasibility of BIM implementation in Algerian AEC industry. GBES 2019 conference proceeding – Towards Continuity and Livability Revolution, 147-154.
Khalid, B., Yaik-Wah, L., & Kherun, N. B. A. (2020). An Investigation of the Challenges and the Best Practices of BIM Implementation in the Algerian AEC Industry. International Journal of Advanced Science and Technology, 29(02): 287-300.
Khosrowshahi, F., & Arayici, Y. (2012). Roadmap for implementation of BIM in the UK construction industry. Engineering, Construction and Architectural Management, 19(6): 610-635.
Lindblad, H., & Vass, S. (2015). BIM implementation and organisational change: A case study of a large Swedish public client. Paper presented at the 8th Nordic Conference on Construction-Economics-and-Organization (CEO), MAY 28-29, 2015, Tampere, Finland.
Lizhu, Z. (2017). Application Research of BIM in Construction Project's Full Life Cycle. Paper presented at the 2017 International Conference on Smart Grid and Electrical Automation (ICSGEA).
Matthews, J., Love, P. E., Mewburn, J., Stobaus, C., & Ramanayaka, C. (2018). Building information modelling in construction: insights from collaboration and change management perspectives. Production Planning & Control, 29(3): 202-216.
McAuley, B., Hore, A., & West, R. (2017). BICP Global BIM Study-Lessons for Ireland’s BIM Programme. Construction IT Alliance (CitA) Limited, DOI, 10, D7M049.
Miettinen, R., & Paavola, S. (2014). Beyond the BIM utopia: Approaches to the development and implementation of building information modeling. Automation in Construction, 43: 84-91.
NBS. (2014). BIM Levels explained. https://www.thenbs.com/knowledge/bim-levels-explained. Retrieved on June 6, 2020
Olatunji, O. A. (2011). A preliminary review on the legal implications of BIM and model ownership. International Council for Research and Innovation in Building and Construction, 16: 687-696
Panzeri, P. A. (2016). Algeria and EU ties highlight strong and dynamic partnership. [2018]. the parliament magazine.
Riitta, S., & Hirvensalo, A. (2008). Implementation of Building Information Modeling (BIM)—A Process Perspective. Paper presented at the Proceedings of the APMS.
Rotimi, J., Arasanmi, C., Rotimi, F., Ramanayaka, C., & Komolafe, A. (2019). Antecedents of BIM Training Effectiveness Amongst AEC Firms in New Zealand. Innovative Production And Construction: Transforming Construction Through Emerging Technologies, 353.
Rowlinson, S., & Yates, D. (2003). nDCAD: a virtual change agent for professions and procurement systems? Construction Management and Economics, 21(8): 849-857.
Soh, C., & Markus, M. L. (1995). How IT creates business value: a process theory synthesis. ICIS 1995 Proceedings, 4.
Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3): 357-375.
Succar, B., & Kassem, M. (2015). Macro-BIM adoption: Conceptual structures. Automation in Construction, 57: 64-79.
Succar, B., Sher, W., & Williams, A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2): 120-142.
Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35: 174-189.
Tekla. (2019). BIM maturity level. https://campus.tekla.com/bim-maturity-levels. Retrieved on December 17, 2019
Wilkins, C., & Kiviniemi, A. (2008). Engineering-centric BIM. ASHRAE Journal, 50(12): 44-48.
Won, J., Lee, G., Dossick, C., & Messner, J. (2013). Where to focus for successful adoption of building information modeling within organization. Journal Of Construction Engineering And Management, 139(11): 04013014.
Wong, A. K., Wong, F. K., & Nadeem, A. (2010). Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4): 288-302.
Yang, J.-B., & Chou, H.-Y. (2018). Mixed approach to government BIM implementation policy: An empirical study of Taiwan. Journal of Building Engineering, 20: 337-343.
Zhao, D., McCoy, A. P., Bulbul, T., Fiori, C., & Nikkhoo, P. (2015). Building collaborative construction skills through BIM-integrated learning environment. International Journal of Construction Education and Research, 11(2): 97-120.
Downloads
Published
How to Cite
Issue
Section
License
Copyright of articles that appear in International Journal of Built Environment and Sustainability belongs exclusively to Penerbit Universiti Teknologi Malaysia (Penerbit UTM Press). This copyright covers the rights to reproduce the article, including reprints, electronic reproductions or any other reproductions of similar nature.
Authors who publish with this journal agree to the following terms:
- This Journal applies Creative Commons Licenses of CC-BY-NC-SA
- Authors retain copyright and grant the journal right of publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).