[1]
2026. An Integrated Neutrosophic Group BWM-FMEA Approach for OHS Risk Assessment in Sustainable Construction Projects. International Journal of Built Environment and Sustainability. 13, 3 (Sep. 2026), 391–406. DOI:https://doi.org/10.11113/ijbes.v13.n3.1564.